-
Recent Posts
Archives
- March 2024
- December 2021
- February 2021
- October 2019
- November 2018
- March 2018
- July 2015
- July 2014
- January 2014
- October 2013
- September 2013
- June 2013
- May 2013
- April 2013
- March 2013
- January 2013
- December 2012
- November 2012
- October 2012
- August 2012
- June 2012
- May 2012
- March 2012
- February 2012
- January 2012
- February 2011
- Community Renewable Energy Grants provided by the Naturesave Trust
Supported by generous grants from Leominster Community Solar and the Midcounties Co-operative
Category Archives: Info
Generator in place
The generator installation was completed on Friday. The system is essentially ready to go once we have the inlet screen in place, which will probably take us into early next week. The photos also show the new eel pass in … Continue reading
Posted in Info
Comments Off on Generator in place
Turbine arrives on site
The turbine is being installed as we speak. Bill comments “The quality of workmanship is impressive. We will have a powerful piece of equipment here – all we need is the river to help us along. With current very low … Continue reading
Posted in Info
Comments Off on Turbine arrives on site
Civil works complete
They say 90% of a hydro project is in the civil engineering. These photos just in really show how much work has gone in. The first picture is from the period of floods when work on this area was just … Continue reading
Posted in Info
Comments Off on Civil works complete
First parts of turbine in place
The turbine house is finished and the capture ring is in place – this is the interface between the turbine and its housing. The draft tube will be next – this is the outflow of the turbine – we have … Continue reading
Posted in Info
Comments Off on First parts of turbine in place
Ready for the turbine
Some great pictures from site showing the sluice gate in place and the precision concrete housings for the turbine – you can clearly see the hole in which it will sit. We are expecting the first parts of the turbine … Continue reading
Posted in Info
Comments Off on Ready for the turbine
Coverage on the BBC website
A story covering the delays with some good pictures of the installation in progress is here: http://www.bbc.co.uk/news/uk-england-shropshire-22101702
Posted in Info
Comments Off on Coverage on the BBC website
Nearly ready for the turbine
A lot of work has been going on at Tetstill – perhaps not spectacular but necessary work to prepare the wheel pit for the turbine enclosure. Some redesign of the enclosure itself has been necessary to make sure the generator … Continue reading
Posted in Info
Comments Off on Nearly ready for the turbine
Steady progress through the floods at Neen Sollars
Installation work continues at a good pace, despite inevitable delays caused by the near-constant floods for the last few months, now alternating with periods of low temperatures which mean concrete work cannot be carried out. The cofferdam upstream and downstream … Continue reading
Posted in Info
Comments Off on Steady progress through the floods at Neen Sollars
The digger turns around
After completing work on the tailrace and a break to allow completion of the salmon run, we are now working on the sluice area – removing silt from the floods and preparing to excavate the turbine tailrace and prepare the … Continue reading
Posted in Info
Comments Off on The digger turns around
Tailrace work complete
We have now finished the work widening and strengthening the tailrace, which will be taking a greater flow than it does now. Work on site will stop for a while, until mid-December. This is so that we do not impede … Continue reading
Posted in Info
Comments Off on Tailrace work complete